Govia Thameslink Railway - F

Govia Thameslink Railway - F
 
Govia Thameslink Railway Rolling Stock
 
In order to replace the Class 319 trains and to operate the expanded Thameslink network, a fleet of 115 eight- and twelve-car Class 700 trains had been procured during the franchise term of First Capital Connect. These entered service between 2016 and 2019.
 
As a consequence of the delayed procurement of the Class 700 trains, 29 Class 387 trains had also been ordered for the Thameslink route to release the Class 319 trains to newly electrified routes. Deliveries were completed during 2014 and the trains entered service later that year.
 
It was originally planned that once the Class 700s began entering service, the Class 387s would be transferred to Great Western Railway for use on routes in the Thames Valley. However, a change of plans saw GWR order an entirely new fleet of Class 387s, so the Thameslink units were instead cascaded to the Great Northern route following delivery of the Class 700s.
 
In addition to these, GTR ordered 25 new six-car trains to replace 40-year-old Class 313 units, which were being run on the Great Northern suburban services out of Moorgate. During December 2015, Siemens was selected to provide these as a follow-on to the Class 700 order. They were designated as the Class 717 in June 2016, and were first introduced in September 2018.
 
In May 2023 the Southern Class 313 units were withdrawn from service.
 
Govia Thameslink Railway Current Fleet
 
Southern
  • Bombardier Turbostar   171   DMU
Oxted line
East Coastway line
Marshlink line
2003–2004
  • Bombardier Electrostar   377   EMU
Entire Southern network apart from sections between Hurst Green and Uckfield & between Ore and Ashford International
2001–2005
2012–2014
  • 387   EMU   TBA
2016–2017
 
Gatwick Express
  • Bombardier Electrostar   387   EMU
Gatwick Express services between London Victoria & Gatwick Airport / Brighton
2015–2016
 
Great Northern
  • Bombardier Electrostar 387   EMU
Great Northern express services between London King's Cross & Ely / King's Lynn / Peterborough
2014–2017
  • Siemens Desiro   717 Desiro City
Northern City Line services between Moorgate & Welwyn Garden City / Stevenage via Hertford North
2018
 
Thameslink
  • Siemens Desiro   700 Desiro City   EMU
All Thameslink services
2015–2018
Past Fleet
 
Former units operated by Thameslink, Southern and Great Northern include:
  • 365 Networker Express   EMU
1994-95 Express services between London King's Cross and / Ely / King's Lynn / Peterborough
2018–2021
  • 313   EMU
1976–1977
Northern City Line
West Coastway line
East Coastway line
Seaford branch line
2019 (Great Northern)
2023 (Southern)
  • 319   EMU
1987–1988
1990
All Thameslink services
2015–2017
  • 321   EMU
1989–1990
Express services between London King's Cross to Peterborough and Cambridge 2016
  • 377 Electrostar
2008–2009
Some Thameslink services
2017
  • 455   EMU
1982–1984
Metro and commuter services from London Victoria & London Bridge
2022
  • 171   DMU
2003-2004
Oxted line
East Coastway line
Marshlink line
2022
 
Govia Thameslink Railway Performance
 
In February 2015, Thameslink and Great Northern came at the bottom of Which? magazine's Best and worst UK train companies customer survey, scoring a customer satisfaction score of 43%. Thameslink and Great Northern were also scored 2/5 stars in each of the specific categories covered by the survey (including Reliability, Punctuality and Cleanliness of toilets) – which is the worst performance of any UK train operator. In the Which? 2017 survey, Thameslink and Great Northern improved their performance slightly with a rating of 46% also, their position in the table was second to bottom (Southern were in bottom place, but had been subject huge disruption due to industrial action).
 
Passenger numbers on Govia Thameslink Railway (which also includes Southern and Gatwick Express) have risen from 262 million annually in 2010–11 to 327 million annually in 2015–16.
 
Govia Thameslink Railway Notes
 
^ Jump up to:a b Trains reverse here
 
Govia Thameslink Railway Overview
 
Franchise(s):
Thameslink, Southern and Great Northern
14 September 2014 – 1 April 2028
Main Region(s):
South East England
Greater London
East Anglia
Stations Operated: 238
Parent Company:
Govia
(Go-Ahead Group 65%, Keolis 35%)
Reporting Mark: GN, GX, SN, TL
 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: