London Underground - London Underground Proposed Line Extensions - G

London Underground - G
 
London Underground Proposed Line Extensions
 
London Underground Bakerloo Line Extension to Lewisham
 
A southern extension of the Bakerloo line from Elephant & Castle has been proposed multiple times since the line opened. In the 2010s, consultation events and preliminary design work took place on an extension. A route from Elephant & Castle to Lewisham via the Old Kent Road and New Cross Gate was chosen by Transport for London in 2019.
 
The line could be extended further on the Hayes National Rail line in future. Estimated to cost between £4.7bn to £7.9bn (in 2017 prices), the extension would take around 7 years to construct. Due to financial impacts of the COVID-19 pandemic, work to implement the extension is currently on hold.
 
London Underground Other Proposed Extensions and Lines
 
Several other extensions have been proposed in recent years, including a further extension of the Northern line to Clapham Junction. The long proposed Croxley Rail Link (an extension of the Metropolitan line) was cancelled in 2018 due to higher than expected costs and lack of funding.
 
In 2019, the Canary Wharf Group suggested the construction of a new rail line between Euston and Canary Wharf, to improve connections to the future High Speed 2 railway.
 
In 2021, Harlow District Council proposed extending the Central line from its eastern terminus in Epping to Harlow. They argued this would reduce travel times to Epping and London, and help with efforts to add 19,000 new homes to the town and expand the population to 130,000. However, no funding has been allocated for this proposed extension.
 
London Underground Line Improvements
  • London Underground Bakerloo Line
The thirty-six 1972-stock trains on the Bakerloo line have already exceeded their original design life of 40 years. London Underground is therefore extending their operational life by making major repairs to many of the trains to maintain reliability. The Bakerloo line will receive new trains as part of the New Tube for London project. This will replace the existing fleet with new air-cooled articulated trains and a new signalling system to allow Automatic Train Operation. The line is predicted to run a maximum of 27 trains per hour, a 25% increase on the current 21 trains per hour during peak periods.
  • London Underground Central Line
The Central line was the first line to be modernised in the 1990s, with 85 new 1992-stock trains and a new automatic signalling system installed to allow Automatic Train Operation. The line runs 34 trains per hour for half an hour in the morning peak but is unable to operate more frequently because of a lack of additional trains. The 85 existing 1992-stock trains are the most unreliable on the London Underground as they are equipped with the first generation of solid-state direct-current thyristor-control traction equipment.
 
The trains often break down, have to be withdrawn from service at short notice and at times are not available when required, leading to gaps in service at peak times. Although relatively modern and well within their design life, the trains need work in the medium term to ensure the continued reliability of the traction control equipment and maintain fleet serviceability until renewal, which is expected between 2028 and 2032.
 
Major work is to be undertaken on the fleet to ensure their continued reliability with brakes, traction control systems, doors, automatic control systems being repaired or replaced, among other components. The Central line will be part of the New Tube for London Project. This will replace the existing fleet with new air-cooled walkthrough trains and a new automatic signalling system. The line is predicted to run 36 trains per hour, a 25% increase compared to the present service of 34 trains for the busiest 30 minutes in the morning and evening peaks and 27–30 trains per hour during the rest of the peak.
  • London Underground Jubilee Line
The signalling system on the Jubilee line has been replaced to increase capacity on the line by 20%-the line now runs 30 trains per hour at peak times, compared to the previous 24 trains per hour. As with the Victoria line, the service frequency is planned to increase to 36 trains per hour. To enable this, ventilation, power supply and control and signalling systems will be adapted and modified to allow the increase in frequency. London Underground also plans to add up to an additional 18 trains to the current fleet of 63 trains of 1996 stock.
  • London Underground Northern Line
The signalling system on the Northern line has been replaced to increase capacity on the line by 20%, as the line now runs 24 trains per hour at peak times, compared to 20 previously. Capacity can be increased further if the operation of the Charing Cross and Bank branches is separated. To enable this up to 50 additional trains will be built in addition to the current 106 1995 stock. Five trains will be required for the Northern line extension and 45 to increase frequencies on the rest of the line. This, combined with segregation of trains at Camden Town junction, will allow 30–36 trains per hour compared to 24 trains per hour currently.
  • London Underground Piccadilly Line
The eighty-six 1973 stock trains that operate on the Piccadilly line are some of the most reliable trains on the London Underground. The trains have exceeded their design life of around 40 years and are in need of replacement. The Piccadilly line will be part of the New Tube for London Project. This will replace the existing fleet with new air-cooled walk-through trains and a new signalling system to allow Automatic Train Operation. The line is predicted to run 30–36 trains per hour, up to a 50% increase compared to the 24–25 train per hour service provided today. The line will be the first to be upgraded as part of the New Tube for London Project, as passenger numbers have increased over recent years and are expected to increase further. This line is important in this project because it currently provides a less frequent service than other lines.
  • London Underground Victoria Line
The signalling system on the Victoria line has been replaced to increase capacity on the line by around 25%, the line now runs up to 36 trains per hour compared to 27–28 previously. The trains have been replaced with 47 new higher-capacity 2009-stock trains. The peak frequency was increased to 36 trains per hour in 2016 after track works were completed to the layout of the points at Walthamstow Central crossover, which transfers northbound trains to the southbound line for their return journey. This resulted in a 40% increase in capacity between Seven Sisters and Walthamstow Central.
  • London Underground Waterloo & City Line
The line was upgraded with five new 1992-stock trains in the early 1990s, at the same time as the Central line was upgraded. The line operates under traditional signalling and does not use Automatic Train Operation. The line will be part of the New Tube for London Project. This will replace the existing fleet with new air-cooled walk-through trains and a new signalling system to allow Automatic Train Operation. The line is predicted to run 30 trains per hour, an increase of up to 50% on the current 21 trains per hour. The line may also be one of the first to be upgraded, alongside the Piccadilly line, with new trains, systems and platform-edge doors to test the systems before the Central and Bakerloo lines are upgraded.
  • Sub-Surface Lines (District, Metropolitan, Hammersmith & City and Circle)
New S Stock trains have been introduced on the sub-surface (District, Metropolitan, Hammersmith & City and Circle) lines. These were all delivered by 2017. 191 trains have been introduced: 58 for the Metropolitan line and 133 for the Circle, District and Hammersmith & City lines. The track, electrical supply and signalling systems are also being upgraded in a programme to increase peak-hour capacity. The replacement of the signalling system and the introduction of Automatic Train Operation and Control is scheduled for 2019–22.
 
A control room for the sub-surface network has been built in Hammersmith and an automatic train control (ATC) system is to replace ageing signalling equipment dating from between the mid-1920s and late 1980s, including the signal cabin at Edgware Road, the control room at Earl's Court, and the signalling centre at Baker Street. Bombardier won the contract in June 2011 but was released by agreement in December 2013, and London Underground has now issued another signalling contract, with Thales.
 
London Underground Overview
 
London Underground Locale: Greater London, Buckinghamshire, Essex, Hertfordshire
London Underground Transit Type: Rapid transit
London Underground Number of Lines: 11
London Underground Number of Stations: 272 served (262 owned)
London Underground Daily Ridership: 3.15 million (January 2023)
London Underground Annual Ridership: 1.026 billion (2022/2023)
London Underground Began Operation: 10 January 1863, 160 years ago
London Underground Operator(s): London Underground Limited
London Underground Reporting Marks: LT (National Rail)
London Underground System Length: 402 km (250 mi)
London Underground Track Gauge:
1,435 mm (4 ft 8+1⁄2 in) standard gauge (1863–pres.)
7 ft (2,134 mm) Brunel gauge (1863–1869)
London Underground Electrification: 630 V DC fourth rail
London Underground Average Speed: 33 km/h (21 mph)
 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: