Merseyrail - Merseyrail History/Merseyrail Collection of Separate Railways - H

Merseyrail - H
 
Merseyrail History
 
Merseyrail Collection of Separate Railways
 
The present Merseyrail system was merged from the lines of five former pre-Grouping rail systems:
  • The Mersey Railway (Liverpool Central to Rock Ferry, Birkenhead Park)
  • The Cheshire Lines Committee railway (Liverpool Central to Hunts Cross section)
  • The Lancashire and Yorkshire Railway (Liverpool Exchange to Kirkby, Ormskirk and Southport sections)
  • The Wirral Railway (Birkenhead Park to New Brighton and West Kirby)
  • The Birkenhead Joint Railway (Rock Ferry to Hooton and Chester section and the Ellesmere Port branch).
The nucleus of the system was the Mersey Railway, which opened from Liverpool James Street to Green Lane, Birkenhead running through the 1886 Mersey Railway Tunnel, one of the world's first underwater railway tunnels.
 
The tunnelled route was extended to Liverpool Central in 1890. A tunnelled branch to Birkenhead Park was added in 1888 to connect with the Wirral Railway and the original line was extended to Rock Ferry to connect with the Birkenhead Woodside to Chester line in 1891.
 
The Mersey Railway was electrified in 1903 being the world's first full electrification of a steam railway. This was followed by the separate Lancashire and Yorkshire Railway line from Liverpool Exchange to Southport, which was electrified in 1906. The electrification of the former Wirral Railway lines to New Brighton and West Kirby took place in 1937 and allowed through running into Liverpool via the Mersey Railway tunnel.
 
Merseyrail Overview
 
Owner: Merseytravel, Network Rail
Area Served: Liverpool City Region and surrounding areas
Locale:
Liverpool City Region (Merseyside and Halton)
Cheshire
Lancashire
Transit Type: Commuter rail
Number of Lines: 2 (plus main line commuter services)
Number of Stations: 68 (66 managed)
Annual Ridership:
2019: 30.6 million
2020: 9.0 million
2021: 20.0 million
Chief Executive: Neil Grabham
Headquarters: Rail House, Liverpool
 
Merseyrail Operation
 
Began Operation: 1977 - 46 years ago
Operator(s): Serco-Abellio
Infrastructure Manager(s): Network Rail
Character: Commuter rail, National Rail franchise
Number of Vehicles: 57
Train Length: 3 cars, 6 cars during peak times
Headway: 15 minutes (general), 5 minutes (central sections), 30 minutes (Ellesmere Port branch, general in evenings and on Sundays)
Technical Track Gauge: 4 ft 8+1⁄2 in (1,435 mm) standard gauge
Electrification: 750 V DC third rail
 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: